A 375.58kW commercial solar PV system with 506.88kWh of battery storage, designed around a working dairy farm’s round-the-clock electricity demand.

Project overview

Across Devon and the wider UK, dairy farmers are facing a familiar challenge: rising electricity costs, pressure on operating margins and the need for more resilient farm infrastructure.

For dairy farms in particular, where refrigeration, milking parlours, water heating and essential equipment create significant daily demand, electricity is one of the most critical operating costs to manage.

For one dairy farm near Great Torrington, the answer was a professionally engineered commercial solar PV and battery storage system: 375.58kW of solar PV paired with 506.88kWh of battery storage, designed to give the farm long-term energy security.

Why reliability matters on a working farm

Energy systems cannot fail during milking, and refrigeration cannot stop. The battery system uses proven LiFePO4 chemistry, chosen for its long cycle life and safety, and the inverter set-up gives the farm redundancy and flexibility. The project includes:

  • 30-year panel performance warranty
  • 10-year battery warranty
  • 10-year workmanship warranty

Watch the drone flyover

See the farm before work started, the installation in progress and the finished system.

Key results

375.58kW

Solar PV system

506.88kWh

Battery storage

£56,594

Estimated annual saving

6–7 yrs

Discounted payback

The property

Dairy farming is energy intensive. From early morning milking through to overnight refrigeration, demand rarely stops: milk cooling, pumping, ventilation, automated feeding, hot water and general site operations all run on electricity.

The farm’s electricity bill had reached around £76,200 a year. The challenge wasn’t just to cut costs: the system had to be reliable, fit in with the farm’s existing infrastructure and perform consistently in Devon’s variable weather.

Property type

Dairy farm

Bedrooms

Floor area

Construction

Previous heating

Build period

VIA Energy van beside the battery storage container at a North Devon dairy farm

The solution

Commercial solar design doesn’t start with roof space – it starts with the business. Before any design work began, our engineers analysed the farm’s historical electricity use, load patterns, daily operating requirements and projected future demand, then designed a fully integrated system around them.

Solar PV

844 JA Solar DeepBlue 4.0 Pro 445W panels, chosen for their efficiency and strong low-light performance, with two Solis 100kW commercial three-phase inverters.

Battery storage

99 PYTES LiFePO4 battery modules giving 506.88kWh of usable storage, so excess solar can be stored and used during high-demand periods.

Control and monitoring

12 Victron Energy MultiPlus-II inverters for advanced battery management and intelligent system control.

Installation process

A well managed installation with minimal disruption to the household.

01

Initial consultation

Site survey, energy assessment and system design.

02

Design and planning

Detailed design, system specification and permissions if needed.

03

Installation

Professional installation by our in-house team.

04

Testing and handover

Full system testing, commissioning and handover.

05

Ongoing support

System monitoring, servicing and long term support.

Results and performance

Once operational, the system is expected to generate around 341,901kWh of electricity a year, with modelling showing around 90% used on site. Annual electricity costs are expected to fall from £76,200 to around £19,696.

Over 25 years the system is forecast to deliver a discounted payback of 6–7 years, a net present value of over £1.35 million and an internal rate of return of 19.4%. Each year it will save carbon equivalent to planting 1,815 trees.

Annual bill saving

£56,594

based on current usage

CO₂ saved per year

1,815 trees

estimated

Less grid electricity

74%

reduction in grid use

Project gallery

Click a photo to enlarge

What our client said

★★★★★

Interested in a similar project?

Tell us about your property and we’ll talk through your options, or call 01271 445515.

Could a grant cover part of the cost?

Many homes can use the government’s Boiler Upgrade Scheme towards a heat pump. We’ll check what applies to your property and handle the application.

News, projects and updates

Occasional emails about our latest projects and anything that could affect your energy costs.

Scroll to Top